Halifax, NS
Seaport. Pavilion 20, 22
This public washroom project involved full interior framing and drywall installation within an active commercial environment.
Lincoln Interiors completed steel stud framing, insulation, moisture-resistant gypsum board, and shaft wall assemblies to support durable, high-traffic use. Careful coordination with mechanical and electrical trades was required due to tight ceiling spaces and exposed services above.
The scope focused on precision detailing around door frames, service penetrations, and fire-rated assemblies. The result is a clean, functional, and long-lasting public facility built to meet commercial performance standards.